- Take a clean mould and apply a thin layer of oil.
- Fill the mould with the concrete mix and vibrate for approximately 10 seconds or until it is level at the back.
- Put the mould outside in the sun on a level surface.
- Wait approximately two hours.
- Cover with a plastic sheet when a crack line between the plastic and the cement is clearly visible.
- Leave under the sheet for 6-8 hours.
- De mould when cement is cured.
<< Back to DIY Guidelines |