DIY Guidelines

Plastic Mould Instructions

  • Take a clean mould and apply a thin layer of oil.
  • Fill the mould with the concrete mix and vibrate for approximately 10 seconds or until it is level at the back.
  • Put the mould outside in the sun on a level surface.
  • Wait approximately two hours.
  • Cover with a plastic sheet when a crack line between the plastic and the cement is clearly visible.
  • Leave under the sheet for 6-8 hours.
  • De mould when cement is cured.

<< Back to DIY Guidelines

 

 

  Copyright © 2006 3D Mouldings. All Rights Reserved. KKDesigned.
Site Map | Privacy Policy | Disclaimer | Terms & Conditions